Can I join 2 concrete slabs?

The article aims to answer everything about “2 concrete slabs”. It will mention the steps for how you can join two concrete slabs too. Read on to know more:

Can I join 2 concrete slabs?

Yes, you can join 2 concrete slabs. To establish the distance between the rebar that was installed in the first slab and the rebar that will be installed in the second slab, consult your project blueprints. 

In order to drill and epoxy splice dowels into the concrete, you must measure and mark the side of the concrete where the two slabs will be linked. The dowels should be offset to the rebar spacing at the width of the dowel. 

For instance, if both slabs are made of No. 5 rebar and the rebar mats are separated out by 18 inches, then you should measure and mark your dowels so that they are spaced apart by 18.5 inches (18″ + 1/2″ diameter of the rebar). Measure and mark your dowels so they fall in the center of the second slab’s rebar mat spacing if your two slabs have differing rebar mat spacing. 

If the first slab is spaced at 12 inches and the second slab is spaced at 18 inches, for instance, measure and set your first mark at 9 inches before continuing to space the markings at 18 inches. By doing this, the dowel will be positioned in the middle of the second slab’s rebar spacing.

How can I join 2 concrete slabs?

To join 2 concrete slabs:

  • Use a hammer drill to drill the holes for your dowels. In the General Instructions section at the start of your project blueprints, drill to the precise depth mentioned. Make sure the drill bit you choose is the same size as the rebar dowel you’ll be using, if not slightly larger.
  • Utilize compressed air to blast the holes clean. As directed by the epoxy gun’s instructions, fill it with your concrete epoxy glue. As far as you can, insert the epoxy gun’s tip into the hole. Slowly pour epoxy into the hole. As the hole fills, pull the gun’s tip out.
  • Your rebar dowel should now be in the hole. Before inserting the dowel as far as it will go, press it in and out several times to remove any air pockets from the hole. The General Instructions portion of your project blueprints will include information about the rebar dowel size. 
  • Allow the epoxy to dry for the amount of time recommended on the packaging. Apply a bead of concrete epoxy above and below the dowels on the face of the first concrete slab’s edge. 
  • Use a box cutter to cut the expansion joint material so that you may press two strips along the edge of the concrete, one above and one below the dowels. Now that you are prepared, pour your slab.

Can I attach a new concrete slab to an old concrete slab?

Yes, you can attach a new concrete slab to an old concrete slab. It is inevitable that the junction between new and old concrete construction may crack and experience expansion and contraction. 

Over time, this expansion and contraction, particularly if they happen at different rates as a result of the concrete parts being exposed to various temperatures, can cause the fracture to grow. Pinning the two parts together using rebar is one method to reduce these separations. 

Rebar or dowels should be the appropriate size for the task. However, for normal driveway, sidewalk, and step repairs, 12-inch rebar is typically sufficient. Very big and enormous concrete components would require thicker gauge rebar.

How can I join old and new concrete slabs together?

  • Drill through the old concrete six inches deep with 5/8-inch diameter holes. Depending on the joint’s primary orientation, drill these holes 12 inches in the center either horizontally or vertically. 
  • Place the holes horizontally if the joint is broader than it is tall. Place the holes vertically if the joint is wider than it is taller. To prevent breaking pieces of the old concrete out of the holes, keep them at least six inches from any edges. Use water to flush the holes.
  • Fill the backs of the holes with epoxy. Just enough should be used to fill the holes halfway. 12-inch lengths of rebar should be inserted into the holes while being twisted to achieve an even epoxy coating along their lengths and around their circumferences.
  • To stop the epoxy from seeping out while curing, insert strips of duct tape against the holes in the concrete and press them over the ends of the rebar. The metal primer should be applied to the rebar that extends from the holes. This will lessen the risk of corrosion.
  • Pour the fresh concrete so that it covers the rebar pins completely.

Conclusion

On various days, several huge slabs are divided into numerous individual pours. Months may elapse before the next part is poured if the following section is planned for a different stage of development. 

Furthermore, you must properly attach the two concrete slabs in order for them to fulfill the project’s structural standards; you cannot just pour two slabs next to one another. Slabs are joined by making a junction that serves as a flexural point to accommodate how the slabs’ varying ages will respond to stress and the effects of the environment. 

Although it may seem difficult, joining two concrete slabs is a simple process that may require a few tries to get properly.

Frequently asked questions (FAQS): 2 concrete slabs

Can I join 2 concrete slabs?

Yes, you can join 2 concrete slabs. To establish the distance between the rebar that was installed in the first slab and the rebar that will be installed in the second slab, consult your project blueprints. 

In order to drill and epoxy splice dowels into the concrete, you must measure and mark the side of the concrete where the two slabs will be linked. The dowels should be offset to the rebar spacing at the width of the dowel. 

How can I join old and new concrete slabs together?

Drill through the old concrete six inches deep with 5/8-inch diameter holes. Depending on the joint’s primary orientation, drill these holes 12 inches in the center either horizontally or vertically. 

Place the holes horizontally if the joint is broader than it is tall. Place the holes vertically if the joint is wider than it is taller. To prevent breaking pieces of the old concrete out of the holes, keep them at least six inches from any edges. Use water to flush the holes.

How can I join 2 concrete slabs?

To join 2 concrete slabs:

Use a hammer drill to drill the holes for your dowels. In the General Instructions section at the start of your project blueprints, drill to the precise depth mentioned. Make sure the drill bit you choose is the same size as the rebar dowel you’ll be using, if not slightly larger.

Can I attach a new concrete slab to an old concrete slab?

Yes, you can attach a new concrete slab to an old concrete slab. It is inevitable that the junction between new and old concrete construction may crack and experience expansion and contraction. 

Over time, this expansion and contraction, particularly if they happen at different rates as a result of the concrete parts being exposed to various temperatures, can cause the fracture to grow. Pinning the two parts together using rebar is one method to reduce these separations. 

Rebar or dowels should be the appropriate size for the task. However, for normal driveway, sidewalk, and step repairs, 12-inch rebar is typically sufficient. Very big and enormous concrete components would require thicker gauge rebar.